1-2.jpg

Bathtrap Installation (5 of 5)

6. Flatten Bathtrap out onto vapor barrier as shown. Make sure the edges of the Bathtrap are folded up as shown in the photo above. Replace blockout (box, tray, foam, etc.). Place Termitape on top of pipe or on blockout.